
(BLN 1334.2066 track plans) New sidings at Cambridge looking north with the station to the left. Right to left, first is the trackbed for future dead end Lines 9 & 8. Lines 7 (bottom right corner) & 6 are also dead end, then through Lines 5, 4 & 3.These are all new and make up the Thameslink Carriage Sidings. Next are Reception Sidings 2 (done by our tour) & 1 (the old 4 & 3 before P7 & P8 were built). The next lines are the split for P8 & P7.
[© Graham James 2019]

