
Our tour about to 'set sail'. The P3 points for the loco release crossover have been plainlined (as shown on the new 2025 TRACKmaps) - the ground frame for the crossover is bottom left corner in the previous photo. For anyone unaware, very helpfully, the nameboard (right) informs people they are at a station. A Eutectic Strip (a bead of stainless weld) is bottom left (below), so rolling stock will reliably operate the track circuit.
[© Graham 'Grumpy' Morris 2025]

