
The August 2025 track plan (with thanks to Peter Scott and Martyn Brailsford). It is ©Peter Scott but not on his website and is for personal use only. Our visit covered every line shown, including the traverser left of the sheds, except those inside the sheds. The 7¼" only anticlockwise line is the extension completed in 2016 (the Tunnel is dated 2014); the other circuits are normally operated clockwise.
[© Peter Scott 2025]

