The Banbury Mountain Climber
Sunday 3rd May 2026
Report by Geoff Treby
When I checked my emails for the ticket and timings for the trip, I was surprised to find an email from our BLN Editor. As I was the first to book, would I do the report, please? So, let that be a warning for you all!
I booked on the basis that I could do a simple out and back by train in a day. Alas, Network Rail had different ideas with engineering work between my home city of Bath and Swindon. So, it was an early morning airport bus to Bath, a long wait, followed by a bus replacement to Swindon, then trains with long waits at Didcot Parkway and Oxford. Then a late running CrossCountry service, so I arrived at Banbury (along with quite a few other participants) about three minutes before tour departure. In total, a 5½ hour journey. It was easier to travel to Dublin for our LUAS Red Line tour the following weekend! However, the expected connections from Southampton and Manchester did both make the tour.
(TRACKmaps 3 p14B 2023) At Chiltern's Banbury Depot, I was hoping that we would cover the north and south headshunts, along with two or three Depot sidings. Passing the Depot on the CrossCountry service, there were a couple of Class 68s and other stock stabled around the depot. So, my hope was a little dented. Little did I know! With over 100 members in 2-car DMU 165006 we set off from Banbury P1, at 11.24½. Surprisingly, we didn't enter the Depot directly but ran out onto the Up line to reverse into the Depot from the south connection. Once in the Depot, we reached the end of the line beyond the stop board of the northern headshunt. This was with permission of the Depot Manger, of course, who had come in on her birthday especially so that our tour could run. Talking to others, a Chiltern member of staff had been overheard saying: 'Don't worry we've a cunning plan to shunt the stock around the site and cover all sidings'. There are four Depot Drivers who shunt stock on three shifts; Depot movements are limited to 5mph, so it was a slow motion railtour with a fascinating commentary from the driver.
First, we covered Sidings 7 and 8, relatively new sidings installed in 2023 (shown on TRACKmaps), known locally as Bodicote Sidings. Next, we traversed Siding 6, 4, 3 and 2, then part of the southern headshunt and into Siding 1. 68026 and coaches were shunted out of the southern end of the headshunt to allow us to reach the very end. We returned via the Headshunt Approach, then covered Siding 1 from the north to achieve overlap with the earlier visit to this siding. Finally, 68025 was shunted out of Siding 5 and in we went, completing the entire layout. In every case the buffer stops were reached completely unobstructed. Then it was back to Banbury P1 via the northern connection, briefly doubling our speed once out of the Depot Limits from 5 to 10mph and that was the end of the tour after two hours.
So, we covered every line, connection and headshunt. A tremendous effort by Chiltern Railways and their staff, especially Dave the Depot driver, who enjoyed his day, despite having to change ends so many times and to birthday girl, Sarah, in the Depot Control Room. Thanks to Andrew Cripps and Kev Adlam who led on our side. It was a most unusual and enjoyable tour and Wot no raffle? However, there was a collection for the crew (the generosity of participants demonstrated just how good the tour was).
It was called the 'Banbury Mountain Climber' as we raised money to sponsor the Chiltern Three Peaks Challenge team supporting Railway Children. The total amount achieved was £3,243.41. This charter continued our excellent, longstanding relationship with Chiltern Railways dating back many years and was the perfect follow on to our 22 Feb 2026 Chiltern Mark 3 farewell railtour.
| Branch Line Society. A Company Limited by Guarantee - Company No 16743754. Registered in England and Wales. Registered address: 6th Floor, Derwent House, 150 Arundel Gate, SHEFFIELD S1 2FN |