The Branch Line Society

Guest



The GOSH Ness Monster
Friday 22nd May 2026 to Sunday 24th May 2026

Report by Mark Herriot


If someone said to me that 40 years after they were withdrawn from service, the Hastings DEMUs were going to go to Scotland on a railtour, I would have said that they were joking. [Carlisle was the furthest north they had been before.]

So, here I was on Fri 22 May at Preston in an 8-Car Hastings heritage unit pondering if we might make it. We had stopped at Preston P7 (the Up & Down Goods Loop), due to what turned out to be a minor electrical problem. The front power car had lost its Global System for Mobile Communications-Railway (GSM-R) connection. Hastings Diesels and the GBRf train crew quickly come up with a solution, run two of the three empty power cars, which had been on the rear of the standard 6-car formation, round to the front of the single leading power car. With good work by the crew and Preston Power Signal Box, we were on our way north, triple headed, just an hour down. Thankfully, the only fault all weekend…

Our tour started from Tonbridge at 08.12, running via Otford, Bromley South, Birkbeck and Kensington Olympia, before joining the WCML for the run north to Scotland. Track highlights included Acton Lane Reception Sidings, Rugby Up & Down Through Siding and Crewe Up & Down Loop. Northampton Down Goods Loop could not be done due to occupation by a freight, so Rugby was reached 15 mins early, the first of many photos stops. After Rugby Through Siding, we ran via the Up Slow in the Down direction to Newbold Jn, then Down the Up Fast to High Oaks Jn, where we crossed to the Down Slow. It was unusual to call at Nuneaton P1 on a train along the Trent Valley. At Rugeley North Jn, our tour crossed from the Down Slow to the Fast, staying on the Fast to Stafford and Crewe (reached 14 early). The run proceeded at pace with photo stops at Penrith P3, while three trains passed us, and Carlisle which was also for a crew change. Two loops were thrown in for good order (Lockerbie and Beattock Summit). All too soon we dropped down to Edinburgh, where I and quite a few others alighted. Just two mins late but the tour left on time for Polmont, then ran ECS to the SRPS at Bo'ness for servicing and stabling.

Saturday dawned bright as I made my way to Linlithgow, the start of the day's tour with the destination of Inverness. This saw the units travel over the highest summits on the UK network, Druimuachdar at 1,484ft and Slochd at 1,315ft. We headed for Haymarket to reverse in bay P0 (no booked use). After a short break, we departed via Haymarket Through Siding then the North Goods Loop, before gathering speed towards, then over, the Forth Bridge. Running via Burntisland, our tour paused at Kirkcaldy then traversed the Engineer's Yard (a loop - TRACKmaps 1 p14 2026 - which, my sources tell me, will become a dead-end siding in the future). Having noted new electrification masts, including the Leven branch, our Hastings unit headed north via Ladybank, then Perth for traversal of the Down Dundee Loop, P4 South and Up Passenger Loop. A pause at Dunkeld & Birnam (rarer P2) for a pathing and photo-stop allowed inspection of the platform south extensions and new P2 level access path (BLNs 1471.1063 & 1495.1291).


Dunkeld & Birnam P2 (Down Loop), awaiting an HST from Inverness to Glasgow; looking towards Inverness.
[© Stuart Hicks 2026]




Some of the team at Dunkeld & Birnam.
[© Stuart Hicks 2026]


A High Speed Train with 43134 & 43125 arrived for Glasgow, so we could begin the long climb to Druimuachdar via Pitlochry and Blair Atholl. The benefits of having four power cars became obvious as we topped the first summit around 40mph. We dropped down to Dalwhinnie for another photo-stop; the station is only a short walk from the Dalwhinnie Distillery but there wasn't time to visit on this occasion… A Class 170+158 DMU combination headed south and we departed north for Inverness.

At Inverness, 66736 & 73970 were on the Caledonian Sleeper stock in adjacent P1; with us, two forms of Southern Region motive power at the Highland capital. We had a break of nearly 3 hours. The Hastings Unit went for fuelling and I, with a few other participants, headed for the Black Isle Bar, also for fuelling.


At Inverness P2, looking towards the buffer stops and concourse.
[© Stuart Hicks 2026]




A further view at Inverness P2, looking towards the buffer stops and concourse.
[© Stuart Hicks 2026]




The ECS departing P2 for refuelling (the Fuel Road is next to, and inside, Rose Street Curve, avoiding the station).
[© Stuart Hicks 2026]




Back in Inverness (this time in P1) after refuelling, taken from the buffer stop end of line.
[© Stuart Hicks 2026]


The run south from the Highland capital was eastwards via Elgin and Huntly. This was relatively quiet; it was interesting to note the recently opened substantial new freight facilities at Morayhill Timber Mill (West Fraser Ltd). Bonded warehouses and barrels of the whisky industry were still evident at Keith and elsewhere, prior to our photo-stop at Huntly. It had been ten years since I had last travelled between Inverness and Aberdeen. The line has seen changes including new stations at Inverness Airport (with a new loop), Forres (with realignment) and Kintore, with redoubling most of Inverurie to Aberdeen.


A photo stop at Huntly, this is looking towards Aberdeen.
[© Stuart Hicks 2026]




The Aberdeen end of the train at Huntly.
[© Stuart Hicks 2026]


In addition, the last of the traditional telegraph pole runs along the line have gone as has rail traffic at Elgin East (last use 6 Aug 2024 by ECS). The Burghead branch is disconnected at Alves Jn, although the branch track was in situ. This was all evident as we headed towards Aberdeen for a 20min pathing stop and crew change. We then headed uphill towards Ferryhill, turning left into Craiginches Yard and the very rusty No2 Loop, under the watchful eye of two Network Rail Mobile Operations Managers.


At Aberdeen, looking towards Dundee.
[© Stuart Hicks 2026]




At Aberdeen, in the other direction, towards Inverness.
[© Stuart Hicks 2026]


There followed a run up the east coast via Stonehaven, Montrose and Arbroath (where sadly, the historic Kerr's Miniature Railway alongside the main line is totally demolished). Then it was through the fourth Barry station (with Links to South Wales) and past the Dundee suburbs alongside the River Tay. At Dundee, we used the Up Through continuing south over the Tay Bridge, then through Leuchars before Ladybank, where we retraced our outward route from Edinburgh in the morning. The run along the north side of the River Forth was wonderful as the sun set. It included Inverkeithing Up Passenger Loop and the Forth Bridge, truly spectacular, then Dalmeny Up Passenger Loop for a short pathing stop.

The evening run to return the stock to Bo'ness was available to participants as far as Falkirk Grahamston, so I stayed on for a late-night trip to Larbert. The train arrived and departed Edinburgh the same way, in via Line 'Z', through P20 and over the crossovers into P2. On leaving the Edinburgh suburbs, we ran via Newbridge Down Passenger Loop with a Linlithgow set down, before heading north through Larbert to reverse in the Down Passenger Loop. After a 20 minute wait, we departed south over the trailing crossover, through Larbert P1, then Carmuirs Jns, with a final set down at Falkirk Grahamston (23.33).

Sunday saw the long run south to London and the Home Counties, starting from Linlithgow, I chose to join in Edinburgh, where the train departed from P17. It arrived via Line 'Y' and the rare route into P17. The run up the West Coast Main Line (WCML) was highlighted by Carnforth Up Passenger Loop then Preston Up Goods Line all the way through to Skew Bridge Jn. Our very keen Coventry member had travelled overnight from home (where he rarely is) on a National Express coach from Birmingham to Carlisle, arriving 05.00. He was the first customer at Wetherspoons (08.00) and the only one drinking coffee there at 08.00, many others didn't even bother with breakfast! Later, he was off to the splendid new Scott and Brassey pub on Carlisle P4 at 11.00, all just to do said Goods Line (the tour left at 11.52).


Our tour reverses at Edinburgh Waverley P17 on Sun 24 May en route from Linlithgow to Tonbridge.
[© Stuart Hicks 2026]




Power car is 1013, 'Tunbridge Wells' at Edinburgh Waverley P17.
[© Stuart Hicks 2026]




he other end of the train; far right, Alan is 'shepparding' participants onto the train...
[© Stuart Hicks 2026]




They start them young at the SRPS. (Neil McDonald's son helped with the raffle - we were in a tearing hurry to get it done.)
[© Neil McDonald 2026]




Carlisle heading south, bidirectional P1 looking north, note the nicely refurbished roof right. To the left are a couple of disused Varamis EMUs in store.
[© Stuart Hicks 2026]


With a run on a Sunday, engineering works are always a factor and this weekend was no exception with our tour going via Manchester due to a WCML closure near Wigan. This led to an interesting run from Wigan North Western via Atherton and the Manchester suburbs. The highlight for me was Manchester Oxford Road P4, then running in the Up direction on the bidirectional Down line to Piccadilly P14, before crossing over just prior to Ardwick Jn to the Up Slow. The rest of the run south was reasonably smooth, with further track highlights being the Northampton Reception Line, Bletchley Relief No2, Tring P4 and Acton Lane Reception Sidings. I alighted at Clapham Junction; the train returned to Tonbridge via Redhill. This tour was an amazing experience and, while not quite as full as hoped, was very well run.


Rugby P6 in the sunshine, looking towards Euston.
[© Stuart Hicks 2026]




Taken through glass (from a departing District line train just caught), our GOSH Ness Monster railtour at Kensington Olympia.
[© Stuart Hicks 2026]




Rare track highlights


Wherever we went, the distinctive Hastings Unit and its sound attracted attention; many photographers were out in the remotest of locations. Much positive publicity was generated for our Society, Hastings Diesels Ltd and Great Ormond Street Hospital Charity. The raffles also raised £1,300 for the charity. The Hastings Diesels and our Society Volunteers worked long hours and should be thanked for their hard work. It was the first multiday Hastings unit tour, their volunteers provided a well-stocked, reasonably priced buffet with hot food throughout the tour and a souvenir shop. Their invaluable travelling fitters worked hard. Thanks also to the SRPS at Bo'ness for all their help stabling the train securely overnight, emptying the toilet waste tanks, topping up with fresh water, offloading rubbish, replenishing catering supplies and arranging fuel for the power cars. Finally, thanks to GBRf who operated the tour so well, to Scotrail at Inverness for fuelling the power cars and particularly to Kev Adlam who masterminded it all.

Back To Top
Branch Line Society.  A Company Limited by Guarantee - Company No 16743754.  Registered in England and Wales.
Registered address: 6th Floor, Derwent House, 150 Arundel Gate, SHEFFIELD S1 2FN