*1J68 Banbury to Stourbridge Junction.
*1H68 Stourbridge Junction to London Marylebone.
*1U68 London Marylebone to Banbury.
Stock: 68013 (country end) 12619 - 12603 - 12618 - 12614 - 12607 - 10271 - DVT 82309 (London end).
*12619 was formerly 11058 and 12175, built 1976.
*12603 was formerly 12053, built 1976.
*12618 was formerly 11008 and 12169, built 1975.
*12614 was formerly 12145, built 1977.
*12607 was formerly 12038, built 1975.
*10271 was formerly 10018 and 10236 Kitchen Buffet First Class built 1979.
*82309 was formerly 82104 Driving Van Trailer converted 2013 built 1988.
*Vossloh / Stadler 'CAT' 68013 of 2014 Vintage, works No2691.
Early memories of the Chiltern Line for me relate to smokey first generation DMUs and later Class 165 Network Turbos and the Class 168 Clubman, now the oldest DMUs on the network. With the double track layout then ending at Princes Risborough, with a long single line on to Aynho Jn with a rarely used passing loop at Bicester North, it is an area I had not visited much over the years. The Chiltern 'Evergreen' projects Phase 1 & 2, reinstating double track from Princes Risborough to Aynho Jn, changed all that so the opportunity to travel over the entire route in the comfort of a Mk 3 coach was too good to miss.
Taking advantage of the £3 capped maximum single bus fare, I joined a stagecoach X5 service from Milton Keynes to Bicester North, arriving in time to see the empty stock for our tour pass through at line speed. I joined the 09.54 Chiltern service (1R16 09.00 Marylebone to Birmingham Snow Hill) for one stop to Banbury, the driver announcing that, due to a fault on the train, it would be delayed at Banbury - more on this later. The 10.06 arrival was in good time for a cross platform change onto our fully booked members only (257 of them), tour train. Due away at 10.20 from P1, it allowed me 14 minutes to find Coach 'D' but the actual stock was lettered B-D-C-C-D! The real Coach 'D' was located.

A sea of stewards, at a secret location, prior to our 22 Feb 2026 Chiltern Railways Mk3 Farewell Tour.
[© Chiltern Railways 2026]
Departing Banbury ahead of 1R16 receiving attention on P2, our Class 68 3750hp Caterpillar power unit sounded great. Route wise, we traversed the Down Fenny Compton Goods Loop, the Emergency Facing Crossover (105m 30ch) to the Up line south of Leamington Spa, then the trailing crossover back to the Down line, to pick up at P2. With the above-mentioned following Chiltern service now fixed, it needed to be in front of us. So, our tour took the Down Hatton Goods Loop (ironically, this had been refused the week before but a friendly Birmingham Rail Operating Centre signaller advises that it is used by passenger trains when necessary). Then it was on to Hatton P3, with a short wait for 1R16 and 2D18 to overtake, 35 and 30 mins late respectively. 2D18 was a Leamington Spa to Stratford-upon-Avon local, which connects with the stricken DMU from Marylebone (and it did) - the next one was in 2¼ hours. We arrived at Hatton 7 mins early and left 5 late via the now unusual connection from P3 to the Down Dorridge, which has no booked passenger use currently, although it had in the past for overtaking moves.
It was onward to Dorridge for the Up & Down Dorridge Goods Loop - the outer one - lengthened not so long ago. At Tyseley South Jn, we took the relatively rare link at 125m 53ch to Tyseley P4 onto the Down Snow Hill Line. The fun continued with a run through the bidirectional Birmingham Moor Street Up P1 in the Down direction, then into Snow Hill P2 via the normally trailing crossover beyond the tunnel.
A run to Stourbridge Junction followed for the facing crossover into P2, prior to detraining for a break. The tour stock ran empty into Stourbridge North Neck and back to the Down Goods Loop. It had been intended that we would visit the Chiltern Railways Depot here. However, NR was unable to check the track in time as there had been a major landslip the week before that was seriously restricting services at Worcester Foregate Street and all local resources were directed to that (BLN 1489.556 of 14 Mar 2026). We couldn't do Rood End Up Goods Loop as it is plainlined at the Smethwick Galton Bridge end.

Stourbridge Junction P2 and the Chiltern team who were on board. (Inset by Stuart Hicks.)
[© Chiltern Railways 2026]

Also at Stourbridge Junction, Martha Haggas our Bookings Officer (amongst other tasks) is centre with Paul Clewlow from Chiltern to her left.
[© Chiltern Railways 2026]
68029 had been previously noted in the sidings at Banbury as the local Thunderbird, while 68020 & 68031 were stabled at Stourbridge Junction. Resident station celebrity Mouser George, the station cat, was noted asleep in his bed within the booking office, unaware of the bigger Cat on our tour upstairs. The P1 station refreshment shop was open and did good business. The Stourbridge Town shuttle came and went, only four times an hour on Sundays (on other days, it's every 10 mins for most of the day).
For the run Up to London, the empty stock arrived into P3 to do the crossover on departure. At Snow Hill, the rare facing crossover was taken into P2 for a break. We then ran through the bidirectional Down Moor Street P2 to crossover on Bordesley Viaduct, then through Tyseley P1. At Dorridge, the Up & Down Passenger Loop (P3) was used, prior to running nonstop at Leamington Spa using the Up Cherwell Valley centre road, avoiding the platform. Next on the agenda was Up Fenny Compton Goods Loop, followed by the lengthy Up Banbury Loop from Reservoir Jn (87m 25ch) to Banbury South Jn (85m 72ch). It needs to be lengthy, as 1,500m long intermodal services run on this line. The bidirectionally signalled section from Aynho Jn over Aynho Flyover in the 'wrong direction' was next, in the Up direction on the Down line (only possible on a Sunday), through Bicester North, crossing back over to the Up at Bicester South Jn. We ran through Princes Risborough on the Up Main (the bidirectional single centre road).

Birmingham Snow Hill P2.
[© Chiltern Railways 2026]

The tour train seen from Snow Hill Platform 3 during the break at the station
[© John Cameron 2026]

Also at Snow Hill, L to R: Andrew Cripps (BLS Fixtures Team), Kev Adlam (our Fixtures Secretary) & Liam Bolland, Chiltern Media Relations Manager.
[© Chiltern Railways 2026]

At Snow Hill, work had recently started to demolish the former tram terminus for reinstatement of P4.
[© David Guy 2026]

Looking towards the end of the former tram platform.
[© David Guy 2026]

The junction for the former tram terminus looking towards St Chads.
[© David Guy 2026]
Further bidirectionality followed with deviations through High Wycombe Down P2 and later Gerrards Cross Down Plat 1, via their respective facing and trailing crossovers. West Ruislip Up Platform Loop was used in the Up direction and, as we made our way into Marylebone P2, Wembley Depot was passed which we would visit later. (68022 was seen at Banbury Depot, with 68011 & 68030 at Wembley Depot.)

At London Marylebone Platform 2, looking towards the end of line.
[© Chiltern Railways 2026]

The other end of the train at London Marylebone Platform 2,
[© Chiltern Railways 2026]

Sitting comfortably, member Bob Bond (author of 'Gauges Galore') cabs 68013 at the country end of Banbury - with permission of course!
[© Bob Bond 2026]
Our last leg back to Banbury was notable for being routed via Wembley Light Maintenance Depot and the Carriage Washer in 'no wash' mode, then it was through Shed Road 2. This nicely complemented our previous Chiltern DMU visit to the Depot. 68014 & 68015 were on shed in addition to the two locos noted on the Up run. At Northolt Park Jn, the tour took the Down Northolt Loop then, at Ruislip Garden Jn, crossed to the Up Main to complete West Ruislip Up Passenger Loop (P1) in the Down direction, immediately afterwards, crossing to the Down Main.
We were put in the bidirectional Up Princes Risborough Loop (P2) to allow a fast train to overtake, prior to heading for Bicester North. Then the tour ran on the bidirectional Up line from the facing crossover just south of Bicester North through Up P2. The bidirectionality continued to Aynho Jn, where we joined the Down line. Finally, at Banbury Depot Jn, we ran onto Banbury Depot Departure line, then Banbury Depot Reception prior to terminating in Banbury P1 at 19.34 where we had started out 9 hours 14 mins earlier. The full tour from Banbury to Banbury was 248m 14ch (the table is thanks to Jim Sellens). It had been the last Chiltern Mk3 set north of Banbury to carry passengers, the final one of all was 68011 with set AL04 on Wed 18 Mar working 1H12, the 07.46 Princes Risborough to Marylebone.
To round off the day, 68032 with a rake of Mk5 stock, in the new Chiltern livery, arrived in Banbury P2, with the 19.41 to Stourbridge Junction (1J55), a transition to the new look on Chiltern Mainline.
With regards to RST (Railtour Standard Time), our tour was booked in at Banbury P1 at 19.32 and my train back to Bicester North was due at 19.38! So, 4 minutes to leap over the footbridge to P3, then the X5 bus back to Milton Keynes. Many thanks to the tour stewards, Chiltern Traincrew and all staff and Society members involved in planning this excellent tour, which raised £19,808.99 for Railway Children.

Mileage table.
[© Jim Sellens 2026]